First Startup After Shutdown; Refrigeration System; Disassembling Compressor; Auxiliary Electric Heater - mundoclima MUENR-H9T Manual De Instalación Y Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

11.7 First startup after shutdown

The following preparations should be made for re-startup of
unit after long-time shutdown:
1) Thoroughly check and clean unit.
2) Clean water pipe system.
3) Check pump, control valve and other equipments of water
pipe system.
4) Fix connections of all wires.
5) It is a must to electrify the machine 12 hours before starup.

11.8 Refrigeration system

Determine whether refrigerant is needed by checking the
value of suction and discharge pressure and check whether
there is a leakage. Air tight test must be made if there is a
leakage or parts of refrigerating system is to be replaced.
Take different measures in the following two different
conditions from refrigerant injection.
1) Total leakage of refrigerant. In case of such situation,
leakage detection must be made on the pressurized nitrogen
used for the system. If repair welding is needed, welding
cannot be made until all the gas in the system is discharged.
Before injecting refrigerant, the whole refrigeration system
must be completely dry and of vacuum pumping.
&RQQHFW YDFXXP SXPSLQJ SLSH DW WKH ÀXRULGH QR]]OH DW ORZ
pressure side.
Remove air from the system pipe with vacuum pump. The
vacuum pumping lasts for above 3 hours. Confirm that the
indication pressure in dial gauge is within the specified
scope.
When the degree of vacuum is reached, inject refrigerant into
the refrigeration system with refrigerant bottle. Appropriate
amount of refrigerant for injection has been indicated on
the nameplate and the table of main technical parameters.
Refrigerant must be injected from the low pressure side of
system.
The injection amount of refrigerant will be affected by the
ambient temperature. If the required amount has not been
reached but no more injection can be done, make the chilled
water circulate and start up the unit for injection. Make the
low pressure switch temporarily short circuit if necessary.
2) Refrigerant supplement. Connect refrigerant injection
ERWWOH RQ WKH ÀXRULGH QR]]OH DW ORZSUHVVXUH VLGH DQG FRQQHFW
pressure gauge at low pressure side.
Make chilled water circulate and start up unit, and make the
low pressure control switch short circuit if necessary.
Slowly inject refrigerant into the system and check suction
and discharge pressure.
CAUTION
Connection must be renewed after injection
is completed.
Never inject oxygen, acetylene or other
f l a m m a b l e o r p o i s o n o u s g a s t o t h e
refrigeration system at leakage detection
and air tight test. Only pressurized nitrogen
or refrigerant can be used.

11.9 Disassembling compressor

Follow the following procedures if compressor needs to be
disassembled:
1) Cut off the power supply of unit.
2) Remove power source connection wire of compressor.
3) Remove suction and discharge pipes of compressor.
4) Remove fastening screw of compressor.
5) Move the compressor.

11.10 Auxiliary electric heater

When the ambient temperature is lower than 2°C, the
KHDWLQJ HI¿FLHQF\ GHFUHDVHV ZLWK WKH GHFOLQH RI WKH RXWGRRU
temperature. In order to make the air-cooled heat pump
stably run in a relatively cold region and supplement some
heat lost due to de-frosting. When the lowest ambient
WHPSHUDWXUH LQ WKH XVHU¶V UHJLRQ LQ ZLQWHU LV ZLWKLQ ƒ&aƒ&
the user may consider to use auxiliary electric heater.
Please refer to relevant professionals for the power of
auxiliary electric heater.

11.11 System antifreezing

In case of freezing at the water-side heat exchanger interval
channel, severe damage may be caused, i.e. heat exchange
may be broken and appears leakage. This damage of frost
crack is not within the warranty scope, so attention must be
paid to antifreezing.
1) If the unit that is shutdown for standby is placed in an
environment where the outdoor temperature is lower than
0°C, the water in the water system should be drained.
2) Water pipe may be frozen when the chilled water target
ÀRZ FRQWUROOHU DQG DQWLIUHH]LQJ WHPSHUDWXUH VHQRU EHFRPH
ineffective at running, therefore, the target flow controller
must be connected in accordance with the connection
diagram.
3) Frost crack may happen to water-side heat exchanger
at maintenance when refrigerant is injected to the unit or
is discharged for repair. Pipe freezing is likely to happen
any time when the pressure of refrigerant is below 0.4Mpa.
Therefore, the water in the heat exchanger must be kept
ÀRZLQJ RU EH WKRURXJKO\ GLVFKDUJHG
92

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Muenr-h9tk

Tabla de contenido