KOBE CH-03 Serie Instrucciones De Instalación Y Manual De Operación página 61

Ocultar thumbs Ver también para CH-03 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

***This installation only applied with the purchase
of an optional duct cover:
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD,
PREVENT DEBRIS FROM ENTERING
THE VENT OPENING.
Decide the location of the venting pipe from the
hood to the outside. Refer to Figure 9.
A straight, short venting run will allow the hood
to perform more efficiently.
Try to avoid as many transitions, elbows, and
long run as possible.
performance of the hood.
Use duct tape to seal the joints between pipe
sections.
If necessary, prepare back wall frame with
cross framing lumber for secure installation.
Using
references
measurements on page 16-17, decide the level
of the lumber. Refer to Figure 10.
Hood Preparation before Installation
Temporarily wire the hood to test for proper
operation before installing.
Important: Peel protective film off the hood
and the duct cover (if any).
Attach ducting transition to hood exhaust with
ten (3/16" x 3/8") screws (included). Refer to
Figure 11.
If necessary, attach two rubber stands
(included) with adhesive tape (included) to the
back corners of the hood.
Use eight (3/16" x 3/8") screws (included) to
attach
the
two
(included) to the back of the hood. Refer to
Figure 12.
WALL MOUNT INSTALLATION
This may reduce the
on
Table
2
hood-mounting
brackets
Figure 9
Figure 10
and
Figure 11
Figure 12
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ch0330sqbCh0336sqbCh0342sqbCh0348sqb

Tabla de contenido