T-Stand - Textron GREENLEE Ultra Tugger 6800-22 Manual De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Setup (cont'd)

T-Stand

Requires: Adequate clearance.
See "Typical Setups Illustrated."
1. Set the puller on the floor with the mounting holes
upward.
2. Position the boom mount so that the puller gearbox
will fit into the cradle of the boom mount and the
puller mounting plates straddle the boom mount
plates.
Gearbox
Boom Mount
Plates
3. Mount the boom mount to the puller.
4. Install two pins from the motor side. Secure the pins
with two hitch pin clips.
Install Hitch Pins
from Motor Side
Greenlee / A Textron Company
6800-22 Ultra Tugger
Puller
Cradle
Mounting
Plates
Boom Mount
Install Hitch Pin Clips
on Capstan Side
Cable Puller and Pulling Package
®
5. Align the two sets of holes in the T-stand with the
two sets of holes in the boom mount.
6. Install two pins. Secure the pins with hitch pin clips.
T-Stand
7. Continue with Setup: Mounting Components later in
this manual.
32
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
Insert
Pins Here

Publicidad

Tabla de contenido
loading

Tabla de contenido