Installation Scheme; Starting / Stopping; General Provisions; Starting The Pump - Comet HPP MLR 250/250 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Each accessory shall be correctly dimensioned/rated and meet the
requirements of current standards:
• Gauge
• Safety valve
• Pressure control valve, manual or automatic
• Anti-pulsation dampener

INSTALLATION SCHEME

NO

5 STARTING / STOPPING

5.1 GENERAL PROVISIONS

- Check there is oil in the pump, by looking at the oil indicator on the
rear cover;
- Make sure the pipes are not clogged and are free from waste;
- Make sure that the intake line is connected and the pump primed. For
no reason whatsoever must the pump work dry – this is to avoid
burning the pressure seals;
- Check alignment and tightness of the motion transmission elements;
- Make sure that all moving part protections are in place and fixed
correctly: joint covers, mechanical seal protections, electric motor fan
cover, etc.;
- Do not start the pump before having connected the intake and delivery
pipes which must be watertight, and open the circuit feed gate valve if
installed.
34

5.2 STARTING THE PUMP

- Start the pump with no load at all, position the pressure valve on "0".
- Let the pump work for a certain length of time, until the oil flows
- Increase pressure gradually with the control valve. The pressure reached
If the safety valve is not installed,
to the pump.

5.3 STOPPING THE PUMP

Each time, before stopping the pump, reset pressure by way of the control
valve or with a discharge device if installed.
5.4 LEAKAGE
SI
No water leaks from the pressure seals during operation. If the seals are
worn however water will leak through the supports.
A groove under the pump body eliminates the water that has leaked.
Replace the pressure seals as soon as possible.

6 USE

6.1 PERMITTED FLUIDS

The MLR series pump has been designed to pump clean water at ambient
temperature. Other liquids of the same viscosity must be approved by our
Technical Office.
The pump must always work under the hydrostatic head (Max 3 bar).
- Reproduction forbidden -
sufficiently.
must be less than the safety valve's calibration pressure.
HPP S.r.l.
is not liable for any damage

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hpp mlr 300/200Hpp mlr 360/170Hpp mlr 420/145

Tabla de contenido