AMPROBE
16.
PRACTICAL REPORTS FOR ELECTRICAL TESTS
16.1.
Continuity Test On Protective Conductors
PURPOSE OF THE TEST
Check the continuity of:
NOTE: This test is to be preceded by a visual check verifying the existence of yellow-
green protective and equalizing potential conductors as well as compliance of
the sections used with the standards' requirements.
INSTALLATION PARTS TO BE CHECKED
protective conductors (PE), main equalising potential
conductors
(EQP),
conductors (EQS) in TT and TN-S systems.
neutral conductors having functions of protective
conductors (PEN) in TN-C system.
MULTITEST2000
secondary
equalising
Connect one of the
test lead to the
protective
conductor
FM socket and the
other
equalizing potential
node of the earth
installation.
potential
of
the
to
the