Wiring The Grafik Eye; Overview Of Iec Pelv/Nec ® Class 2 Wiring - Lutron GRAFIK Eye QS Serie Guía Rápido De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Wiring the GRAFIK Eye

Overview of IEC PELV/NEC
IR Wiring
18 AWG (1.0 mm
)
2
each terminal
From external
IR connection
(by others)
Contact Closure Input Wiring
24 V
50 mA
For settings, see the full installation
and operation guide at
www.lutron.com/qs.
Example:
Occupancy sensor
18 AWG (1.0 mm
(maximum 1)
each terminal
Signal
+V Input
Circuit Common
LUT-ELI-3PH
Example:
Emergency lighting interface (maximum 1)
Note: The GRAFIK Eye
QS control unit
®
must be powered by a Normal/
Emergency distribution panel for
proper ELI operation. Refer to the
LUT-ELI-3PH Installation Guide for
the complete wiring diagram.
®
QS Control Unit:
®
Class 2 Wiring
®
1: IR DATA
2: IR COM
A: CCI SIG
B: 24 V
QS Link Control Wiring
C: CCI COM
24 V
100 mA
Common and power (terminals 1 and 2):
Two 18 AWG (1.0 mm
)
2
Two 12 AWG (4.0 mm
To control stations,
shades, or other
GRAFIK Eye
A: CCI SIG
control units
B: 24 V
C: CCI COM
Data (terminals 3 and 4):
Twisted, shielded pair 22 AWG (0.5 mm
each terminal
For additional information, see the complete installation and operation guide at www.lutron.com/qs
1 2 3 4 5 6 L N
) each terminal (for link <500 ft/153 m)
2
) each terminal (for link 500-2000 ft/153-610 m)
2
1 2 3 4 5 6 L N
QS
®
1 2 3 4 5 6 L N
GRAFIK Eye
QS Control Unit Quick Installation and Operation Guide 6
®
1 2 3 4 5 6 L N
1: COM
2: 24 V
*
* Do not connect terminal 2
3: MUX
between any GRAFIK Eye
4: MUX
control unit and any other power
supply, including another GRAFIK
Eye
QS control unit.
®
See "Power Group Wiring" for a
)
detailed wiring example.
2
Note: Use appropriate wire connecting
devices as specified by local
codes.
QS
®
N H 1 2 3

Publicidad

Tabla de contenido
loading

Tabla de contenido