Volume
3
Volume
2
FIX THE WALL BRACKET TO THE WALL
Horizontal Model
Drilling
points A
1
Fix the wall bracket to the floor
and against the wall. Identify the
drilling points A. These give the
position of the lower fixings.
Drill the 4 holes and put appropriate raw plugs in your wall (e.g.
3
plaster board, concrete). Position the bracket and screw it in.
24
Volume
1
Control
box
Volume 1
Volume 2 Electrical equipment
Volume 3 Electrical equipment
Drilling
points B
Drilling
points A
2
Move the wall support up,
causing the points previously
identified with the drilling holes
A to coincide.
Mark the 2 drilling points B
using a ball point pen. You have
thus identified the 4 drilling
points.
No electrical
equipment
Class II – IPX4
Class II