Electrical Installation
1.
Turn the top section of the sensor a
quarter turn anticlockwise and
remove it
2.
Loosen the clamping screw on the
M12 connection and pass through
the measuring line from the control
device
Fig. 7: 2-lead connection
3.
Strip the ends of the cables, fit
cable end sleeves
( ⌀ max = 0.5 mm
the 2-lead connection:
1 = plus, 2 = minus
4.
Bring approx. 5 cm of the meas‐
uring wire into the sensor and
tighten the clamping screw on the
connection
5.
Push the top section of the sensor
right into the sensor shaft and turn
clockwise up to its stop
A0102
2
) and connect to
Installation
23