Descargar Imprimir esta página

Commissioning; Calibration - ProMinent DULCOTEST CLO 1 Instrucciones De Servicio

Ocultar thumbs Ver también para DULCOTEST CLO 1:

Publicidad

Idiomas disponibles

Idiomas disponibles

Commissioning

6

Commissioning

Users' qualifications: Technical expert, see
n
on page 11
CAUTION!
Incorrect metering due to sensor failure
Possible consequence: Slight or minor injuries, material damage
If a sensor fails then there may be an incorrect reading at the input of the con‐
troller/measuring device
This may result in uncontrolled metering
The operator must therefore ensure that no subsequent damages can result
from this
CAUTION!
Do not switch off the measuring system during intermittent operation!
A run-in time will be necessary following operation without chlorine. Switch on
metering equipment with a time delay if necessary!
If no chlorine is added for a long time ( ~ 1 week) then the sensor must be reacti‐
vated using emery. The sensor is once more ready for use after expiration of the
run-in time and a repeat calibration.
Run-in time
The sensor requires a specific run-in time to display a steady display value.
Initial commissioning:
After cleaning the working electrode and
counter electrode:
Repeat operation:
Electrolyte replacement:
* the exact run-in time depends on the application.
24
Ä Chapter 1.2 'Users' qualifications '
1 - 24 h (typically 6 h)*
1 - 24 h (typically 6 h)*
1 - 24 h (typically 6 h)*
1 - 3 h

Publicidad

loading

Este manual también es adecuado para:

Dulcotest clo 2