Descargar Imprimir esta página

Sola HD SDU Serie Manual Del Usuario página 7

Ocultar thumbs Ver también para SDU Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

turn the UPS ON. Press the button for less than one second to activate the
battery needs to be recharged and tested. The LED will illuminate when the
load, the LED and alarm will continue for two minutes.
supplying battery power to the loads.
input voltage is normal.
Screw
Insulation Withstands Volts
PCB Hole Diameter
Wire Range
Screw Torque
panel switch including ON/OFF/Test functions with Green Mode enabled or
disabled.
English version
Press the button for more than one second to
: The LED illuminates when the UPS is
(see table below)
(see table below)
Protection from ac overload and short circuit.
The remote switch provides the same functions as the front
S O L A
The LED illuminates when the line
-

Publicidad

loading

Este manual también es adecuado para:

Sdu 500Sdu 850Sdu 500-5Sdu 850-5