Mounting
4. Mounting
Orientation
Mounting Points
8
Each PVP™ X3 is constructed of aluminum die-cast. This ensures each panel is stable
and easy to install. Each panel also has a convenient built-in handle located on the top,
backside of the panel along with an alignment nipple on the top. This combination
enables you to easily pick up and securely hold each panel while mounting and working
with the panels.
The PVP X3 can be assembled to provide any number of modular designs. The panels
on the top can be securely hung from a truss or other stable surface. Always hang in a
safe position with adequate space for ventilation, configuration, and maintenance.
Chauvet recommends following the general guidelines below.
· When selecting an installation location, consider ease of access for operation and
routine maintenance.
· Make sure to hang away from any flammable material, as indicated in the
Notes
section.
· Never mount in places where rain, extreme temperature changes, or restricted
ventilation may affect it.
· Make sure that the structure to which you are hanging the panels can support the
weight.
See the
Technical Specifications
1. Threaded Mounting
Holes Size M12 (4x)
2. Male Speego
Connection
3. Female Speego
Connection
for the weight requirement of each PVP™ X3.
1.
3.
2.
2.
1.
2.
Safety
3.
1.
3.
3.
1.
2.
PVP™ X3 User Manual, Rev. 1