Typical PVP™ Installation
8. Typical PVP™ X3 Installation
Because a video wall system can include different components to provide a simple to complex modular wall design, use
the following steps as a general guide to get started.
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
24
Open and examine the PVP™ X3 road case to make sure you have received all products
and accessories and that each one is in good condition.
Apply power and run the self-test for each PVP™ X3 to ensure all LEDs and inside
connections in each panel are working (optional).
Create a stable mounting surface (e.g., truss or other stable surface) for PVP™ X3
mounting.
Mount the first top row of the PVP™ X3s. Refer to the
Adjust the alignment of the first row using the speego connectors.
Connect the signal source to the VIP™ Driver. Connect the VIP™ Driver to the VIP™ Signal
Distributor (if applicable).
Connect either VIP™ Driver or VIP™ Signal Distributor (if being used) to the Input Signal
socket of the first panel in your connection chain.
Based on your video wall configuration (design), join each panel, either horizontally or
vertically, using the instructions in the section,
Design).
Refer to the instructions and information in the section of this User Manual,
(Cabling) Each PVP™
X3.
Mounting
section in this User Manual.
Joining Each PVP™ X3 (Creating a Modular
PVP™ X3 User Manual, Rev. 1
Connecting