LD-5010
5
Bowl Mounting with WashBar (to Bracket and Wall)
WARNING Backing substrate required for
structural integrity if brackets
aren't secured to a stud.
Secure brackets to wall using 3/8"
A
fasteners (supplied by installer). See
Structural Rough-Ins section for
bracket mounting locations.
Bracket locations and
quantities vary depending
on the deck layout.
6
Install P-Trap
Drain Adapter
7
Strainer and Drain Cap
WashBar removed for clarity.
Drain cap is labeled front and back. Be sure front is
facing the user. Top surface of drain cap should be
sloped away from user.
Position drain cap over
trough strainer, aligning
tabs into drain. Push
A
drain cap down until drain
cap is flush with basin.
Grommets should hold
drain cap securely against
drain trough walls.
To remove drain cap,
carefully slip flat
B
screwdriver into left or
right hand corner of
drain cap and gently lift
upwards.
16
P-Trap
11/21/2019
Apply PC-Concrete® injectable repair
B
and anchoring epoxy (or equal) to
the top of the mounting strips (left-
hand bracket shown).
1 station shown, 2 station similar.
Front
Bradley • 215-1869 Rev. E: ECO 19-11-006
Installation
Note Angle of
Drain Cap