S19-310BF
Assembly of Components
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-052
10
11
12
13
14
NOTE: Use
teflon tape
only.
NOTE: Items 10.1–10.5 come preassembled as Item 10.
Items 24.1–24.8 come preassembled as Item 24.
4
R
18
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
19
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Signed
Date
Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
9
10.2
10.3
10.4
10.5
10.1
10.21
Align
handle
pieces as
shown.
15
5/23/12
NOTE: If tee (Item 7) is used as a supply
inlet, use plug (Item 8) on tee (Item 2)
8
7
Optional 1¼" NPT
Supply Inlet (best for
rigid support)
6
4.12
4.10
4.8
4
4.7
4.6
4.5
4.4
4.3
4.1
4.22
4.21
Use caution when connecting
Items 3, 4.2 & 5. Hand tight
plus
⁄
turn is sufficient.
1
8
Bradley • 215-619 Rev. J; ECN 12-05-016B
2
1¼" NPT
Supply Inlet
4.11
5
4.9
Flow control
this end
4.25
4.24
4.23
4.25
4.28
4.27
4.26
16
17
3
2
1¼" NPT
Drain Outlet
1
Installation
4.21
4.261