Lighting; Check Before Lighting; Startup Stage; Vista Anteriore - Ravelli HR EVO 290 Manual De Instalación, Uso Y Mantenimiento

Caldera de pellets
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

The Figure opposite describes the meaning of the status
indicators in the left part of the display.
Activation of one of the segments on the display signals
activation of the corresponding device according to the list
opposite

Lighting

Check before lighting

Before lighting the boiler:
-
make sure to have read and understood the information given in the manual;
-
follow the oral instructions on operation of the unit provided by the installer prior to use.
-
the hopper must be filled with pellets;
-
the combustion chamber must be clean;
-
the brazier must be completely free, cleaned of any combustion residuals and correctly fitted in the brazier holder;
-
check hermetic closing of the ash box and fire door;
-
check the connection of the power cable and switching to ON/1 of the switch located on the back of the boiler.
-
check opening of the delivery and return shutoff valves as well as the water circuit pressure.
Any lighting done after long idle periods requires the removal of any residual pellets that have remained inside
the hopper, in being damp fuel no longer suitable for combustion, and complete cleaning of the combustion
chamber.

Startup stage

To light the boiler, press the button 'P4' for 3 seconds: the message 'START' will appear on the display.
This stage is automatic and managed entirely by the electronic controller without the possibility of changing the parameters.
Alternatively the boiler can be lit by pressing the buttons P4 and P5 together for 3 seconds. The message AWAITING REQUEST
appears on the display. With this mode the boiler switches to standby status and carries out the lighting-start stage only if a request
for heat is recognised, e.g. to heat the water or for DHW (if available).
Dialogue
box
HR EVO 290 - 350 - 390
SET
SET
SET
Clock
use and maintenance manual
Crono
Heater
Auger
Fume extractor
DHW circuit activation
HEATING circuit activation
ALARM

vista anteriore

vista anteriore
vista anteriore

Water temperature

Rev.1 16/03/2018
Pag.71
Storage tank-Puffer H20
Button 'P4'
ENG

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hr evo 350Hr evo 390

Tabla de contenido