Plumbing Connections; Plumbing Accessories (Optional); Gas Supply; Smoke Outlet And Combustion Air Inlet - Sime BRAVA ONE OF ErP Serie Manual De Instalación Y Mantenimiento

Calderas murales de baja temperatura
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

m
CAUTION
The height of the boiler is to be such that disassembly
and maintenance interventions are facilitated.
2.9

Plumbing connections

The plumbing connections have the following characteristics
and dimensions.
=
65 65 65 65
M
U
G
E
L
Description
M - System delivery
R - System return
U - Domestic hot water output
E - Domestic hot water inlet
G - Gas supply
W (mm)
2.9.1

Plumbing accessories (optional)

To facilitate plumbing and gas connections to the systems, the
accessories as shown in the table below are available and are to
be ordered separately from the boiler.
DESCRIPTION
Installation plate
Curve kit
Curve and valve kit with connections from DIN
to SIME
Cocks kit
Valve kit with connections from DIN to SIME
Wall mount replacement kit for other makers
Fitting protection Kit
Polyphosphate dosing kit
Dosing recharge kit
NOTE:
kit instructions are supplied with the accessory itself or
are to be found on the packaging.
74
=
95
R
Fig. 13
Brava One OF ErP
25
Ø 3/4" G
Ø 3/4" G
Ø 1/2" G
Ø 1/2" G
Ø 3/4" G
450
CODE
8075441
8075418
8075443
8091806
8075442
8093900
8094531
8101700
8101710
2.10

Gas supply

boilers leave the factory specifically
Brava One OF ErP
prearranged for G20 gas or G30/G31. The G20 models can be
converted to function with G30/G31 using the "specific nozzle
kit" (optional) provided by Sime on request separately from the
boiler.
If changing the type of gas to be used, carry out the entire "GAS
phase of the appliance.
CONVERSION"
Boiler connection to the gas mains must be carried out in full
compliance with installation Standards in force.
Before connecting the boiler to the gas mains, the user must
ensure that:
– the type of gas is correct for the appliance
– the pipes are clean
– the gas supply pipe is the same dimension as or greater than
that of the boiler fitting (G3/4") and with a load loss less than
or equal to that contemplated between the gas mains and the
boiler.
a
WARNING
Once installation has been completed, check that
the joints are air tight as indicated in the installation
Standards.
m
CAUTION
It is recommended that the gas line has a suitable
filter.
2.11

Smoke outlet and combustion air inlet

boilers take in combustion air from the room
Brava One OF ErP
where the boiler is installed through the ventilation openings
which must fully comply with Technical Standards.
Permitted outlets
B11BS
Combustion air inlet into the atmosphere and smoke outlet to
open air.
opening for combustion air (6 cm
NOTE:
On the basis of REGULATION
COMMISSION of 2nd August 2013:
"This natural draught boiler is intended to be connected only to
a flue shared between multiple dwellings in existing buildings
that evacuates the residues of combustion to the outside of the
room containing the boiler. It draws the combustion air directly
from the room and incorporates a draught diverter. Due to
lower efficiency, any other use of this boiler shall be avoided
and would result in higher energy consumption and higher
operating costs."
EN
B11BS
B11BS
Fig. 14
x kW).
2
(UE) N. 813/2013 OF THE

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Brava one 25 of erp

Tabla de contenido