6
Startup Operation
Important
The transmitter is immediately ready for operation after mounting and installation of the
connections. The parameters are set at the factory.
The connected wires must be checked for firm seating. Only firmly seated wires ensure full
functionality.
7
Appendix
Important
All documentation, declarations of conformity and certificates are available in the download
area of ABB Automation Products GmbH.
www.abb.com/temperature
7.1
Additional documents
•
Operating instructions (OI/TTF350)
•
Data sheet (DS/TTF350)
CI/TTF350-X1
TTF350
Startup Operation
EN - 29