Getting Started - Belkin OmniView PRO3 Manual Del Usario

Ocultar thumbs Ver también para OmniView PRO3:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 194
Installation
Example of Daisy-Chain Configuration
cable 1
cable 2
cable 3

Getting Started:

Step 1: Make sure that all servers and PRO3 KVM Switches are powered off and
that each PRO3 KVM Switch has been assigned a unique BANK address.
Step 2: Place all primary and secondary KVM switches in the desired location.
Step 3: Connect the console monitor, keyboard, and mouse to the console ports
of the primary switch (BANK 00). Refer to "Connecting the Console to the PRO3
KVM Switch" on page 14.
22
22
Primary unit (BANK 00)
Secondary unit ( BANK 01)
Secondary unit ( BANK 02)
Secondary unit ( BANK 03)

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

F1da104zeaF1da108zeaF1da116zea

Tabla de contenido