Descargar Imprimir esta página

Craftsman 247.240800 Manual Del Operador página 28

Publicidad

Idiomas disponibles

Idiomas disponibles

MONTAJE E INSTALACIÓN
7.
With the bagger cover open, insert the upper chute tube into the discharge
chute then pivot the upper chute tube into position so that the chute rests in
the upper chute support. See Figure 46.
Note: Make sure to align the upper chute with the ridges on the upper chute
support.
Figure 46
28

Publicidad

loading