Parts; Start Up; Cartridge Loading - Truper CLNE-18 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Parts

Handle
Air
intake
Trigger
Cartridge
lock
Contact
lock
Nails
cartridge

Start Up

Air Supply Connection
• Before connecting to the tool, connect the hose to the
A
B
compressor and let some air run through the hose and
coupling, to verify both are clean.
• If a filter-oil feeder similar to the one recommended in
page 3 is not available apply a few drops of oil suitable for
tools into the air inlet (A).
• Connect the air hose to the tool with an empty cartridge
using a fast coupling (B).
CAUTION
Before
connecting the hose to the tool double check the staple
cartridge is empty.
• The fast coupling is very useful to quickly connect and
disconnect the tool and interchange them easily.

Cartridge Loading

• Disconnect the air hose from the tool.
• Open the cartridge pressing the cartridge lock (C)
C
and pulling backwards the cartridge cap (D).
• Place the nails into the open cartridge and push
D
them forward as indicated in the illustration.
• Set the nails into the cartridge with the tips
downwards.
CAUTION
Double check the nails are not dirty
or damaged.
• Close the cartridge pushing the cover. Block it with
the cartridge lock.
7
ENGLISH

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

13180

Tabla de contenido