Levolor Fabric Guia De Instalacion página 9

Ocultar thumbs Ver también para Fabric:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OUTSIDE MOUNT (OM)
STEP 3: INSTALLING THE SHADE
Locate the left side shade bracket.
Align the notch in end cap to alignment mark on the shade.
Insert shade left side first, and while the right side is still
free/not installed, check for movement by lightly rotating
shade so that bottom rail rotates toward the window.
— If the shade resists movement, the groove and tape are aligned.
— If the arrow rotates and no longer points to the groove, you will need to remove
shade and restart.
Insert right side of shade until the shade clicks into the bracket.
— Make sure the thin power cord does not get caught between bracket and motor.
Slide bracket end cap over bracket on the right side for a finished appearance.
Remove all materials securing the shade (tape, arrows, plastic).
Insert batteries into battery wand.
STEP 4: INSTALLING THE SATELLITE BATTERY PACK
Mark position of satellite battery wall mount bracket.
— The satellite battery may be mounted in any orientation.
— Position the battery pack close to the power cable.
— The double-side tape is optionally provided to aid installation.
Screw in the wall mount bracket.
Insert batteries into battery wand, following
the markings for correct orientation.
Install the battery pack into the wall bracket.
Attach the optional battery wand cover over the
satellite bracket assembly.
— Note that the cover is paintable.
Plug power cord into battery wand.
Plug the other end of the extension cable into the
socket in the battery pack.
INSTALLATION
Wall Mount Bracket
Socket
Socket
Slot
Slot
Battery Wand Cover
Socket
Socket
Battery Pack Cover
Power Cable
Power Cable
from Shading
from Shade
Motorized Lift Control–Open Roll
Wall Mount Bracket
Battery Wand Cover
Battery Pack Cover
Extension
Extension
Cable
Cable
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Solar

Tabla de contenido