Descargar Imprimir esta página

Plumbing Access Ports; Plumb The Sample And Drain Lines - Hach 5500sc Instalación

Ammonia/ monochloramine
Ocultar thumbs Ver también para 5500sc:

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure 3 Sampling methods
1 Air

Plumbing access ports

Make plumbing connections through the plumbing access ports. Refer to
enclosure rating, make sure that plugs are installed in the plumbing ports that are not used.
Figure 4 Ports for one or two sample streams
1 Sample 2 bypass drain for two
sample stream analyzers
2 Not used
3 Sample 2 inlet for two sample
stream analyzers
4 Sample 1 inlet

Plumb the sample and drain lines

Explosion hazard. Use only the supplied regulator from the manufacturer.
2 Sample flow
5 Chemical drain
6 Rear of analyzer
7 Sample holder drain
8 Sample holder overflow
C A U T I O N
Figure
4. To keep the
9 Case drain for leaks or spills
10 Sample 1 bypass drain
English 9

Publicidad

loading