1. WARNING: Risk of fire. Do not use as a resi-
dential or household heater.
2. Do not use outdoors.
3. This heater is not intended for use in
bathrooms, laundry areas, and similar indoor lo-
cations.
4. CAUTION: Do not operate without stand at-
tached.
The Hot One may sit on a floor surface or be mounted to the wall, or on the ceiling, using the universal stand provided.
If mounted on the wall, maintain 6 inch minimum clearance from the top of the unit to the ceiling (See Figure 2).
Recommended for elevations under 7500 feet.
Heater Inspection
STEP 1
Thoroughly inspect your heater for any shipping or handling damage and remove any paper or packaging material around the heater.
Mounting
STEP 2
Wall Mount
1. Remove stand from heater by loosening knobs on each side.
2. Place stand in desired position on wall (See Figure 3). Note: A 240 volt
receptacle must be within six feet of the heater.
3. Using a level across the top of the stand, mark the three keyhole loca-
tions indicated (See Figure 4). IMPORTANT: the top, center keyhole must be
screwed into a wall stud.
4. Insert one of the 2 inch screws provided into the top, center keyhole posi-
tion, leaving enough of the screw sticking out to attach the stand later (See
Figure 6).
5. Using a ⅜ inch drill bit, drill holes through the drywall in each of the two
bottom keyhole positions. Insert drywall anchors (provided) in each hole.
6. Insert the drywall anchor screws until completely screwed in. Then back
each anchor screw out about ½ inch. Place the stand on the three exposed
screws and tighten all three screws.
7. Place heater on stand and tighten knobs.
8. Proceed to OPERATING INSTRUCTIONS.
Ceiling Mount
1. Securely fasten a piece of plywood (not provided) across two of your ceiling
rafters that is a minimum of ½ inch thick, 8 inches wide and long enough
to span the distance across the two rafters (See Figure 6). Note: A 240 volt
receptacle must be within six feet of the heater.
2. Remove stand from heater by loosening knobs on each side.
3. Attach the stand to the plywood with the three 2 inch screws provided
through the three small holes indicated (See Figures 5, 6 and 7).
4. Place heater on stand and tighten knobs. Tilt top of heater down
approximately 30 to 45 degrees toward your work area (See Figure
5. Proceed to OPERATING INSTRUCTIONS.
ceiling rafters
Figure 6
INSTALLATION INSTRUCTIONS
screw
Figure 7
½" plywood
5. Heater must be kept clear of all obstructions:
3 foot minimum clearance from front, 6 inch min-
imum clearance from back and top, and 12 inch
minimum clearance from sides. See Figure 2.
6. Always plug the heater directly into a 240 volt
wall receptacle. Never use an extension cord.
Figure 4
ceiling
8).
mount
Figure 5
screw
screw
Ceiling Mount
Figure 3
screw
drywall
drywall
anchor
anchor
Parts Package
Figure 8
Wall Mount
wall
mount
Page 3