INSTALLATION

7 INSTALLATION
WARNING
 
During installation and commissioning of the
AC Power Analyser, the Safety Guidelines
and Measures are applicable at all times. See
chapter 2 of this manual.
CAREFUL!
Wrong connections may cause damage to the
AC Power Analyser and other equipment as
well, which is not covered by warranty!
CAREFUL!
Use isolated tools!
2
1
L
6
N
Figure 10: Connections for the AC Power Analyser
14
3
4
5

7.1 THINGS YOU NEED FOR INSTALLATION

❑ 2 mm flat blade screwdriver for fastening the wires in
the connector terminals
❑ AC Power Analyser
❑ AC plug with cover
❑ Current coil
❑ MasterBus cable
❑ Terminator for MasterBus

7.2 INSTALLATION SEQUENCE

WARNING
 
Be sure that all AC and DC systems
are switched off or disconnected during
installation. Do not install the fuses before the
installation is completed.
CAREFUL!
Take special care to avoid sharp bends of
the cables during installation of the wiring.
Also be careful not to run the cable on sharp
edges to prevent damage.
1. AC voltage measurement connection
with cover, fused properly
2. Current measurement, using the coil
and twisted wires
3. Potential free contact connection for
maximum 5A 250V relay
4. RJ12 connection for communication
with Mass Sine inverter
5. MasterBus connectors
6. AC source: shore power, generator
or inverter
7. AC load
7
February 2011 / AC Power Analyser / EN