Installation - Omcan BB-CN-0012-G Manual De Instrucciones

Tabla de contenido

Publicidad

Leave shelves in place to prevent children from easily climbing inside.
REFRIGERANT DISPOSAL
Your old refrigerator may have a cooling system that used "ozone depleting" chemicals. If you are throwing
away your old refrigerator, be sure the refrigerant is removed for proper disposal by a qualified service
technician. If you intentionally release any refrigerants you can be subject to fines and imprisonment under the
provisions of the environmental regulations.
Tools required: Phillips screw driver.
Use a Phillips screw driver to remove the four (4) screws from the L-bracket connecting the unit to the
wood skid. Then remove the L-bracket from the unit.
Remove skid by unscrewing all base rail anchor brackets. Place skid to the side.
Carefully upright cabinet.
When lifting unit do not use the counter top as a lifting point. Also remember to leave cabinet upright
for 24-hours before plugging into power source.
Set unit in its final location. Make sure there is adequate ventilation in this location. Under extreme heat
conditions (+100°F / +38°C) an exhaust fan may be necessary.
Proper leveling of the unit is critical to operating success (for non-mobile models). Effective condensate
removal and door operation will be affected by leveling.
The cooler should be leveled front to back and side to side with a level.
Warning: Installation without proper ventilation will void the manufacturer's warranty.
SEALING CABINET TO FLOOR
Step 1 - Position Cabinet
Allow one (1) inch between the wall and rear of the refrigerated bar equipment to assure proper ventilation.
Step 2 - Level Cabinet
Cabinet should be level side to side and front to back. Place a carpenter's level in the interior cabinet floor in
four places:
A Position level in the inside floor of the unit near the door. Level should be parallel to cabinet front.
B Position level at the inside rear of cabinet. Level should be placed parallel to cabinet back.
C Perform similar procedures to steps A and B by placing the level on inside floor left and right sides parallel to
5
Safety

Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido