Putting Into Operation; Electric Shock - Abicor Binzel CR1000 Instructivo De Servicio

Recirculador de refrigerante
Ocultar thumbs Ver también para CR1000:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Putting into operation

1
Heat exchanger (finned radiator), 2-row
2
Coolant supply (blue)
Fig. 5
Overview of the coolant circuit
6 Putting into operation
Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout the entire duration of maintenance, servicing,
assembly, disassembly and repair work:
• Switch off the power source.
• Disconnect the mains plug.

Electric shock

Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
NOTICE
• Please take note of the following instructions:
• The system may only be installed and put into operation by authorised personnel (in Germany see
• Components must only be used in environments with sufficient ventilation.
• The connection (serial or parallel connection) of several cooling units can result in material damage.
• Make sure that the cooling unit is filled with cooling liquid before it is put into operation.
• The coolant pump must never run dry as this will destroy the pump and render the warranty invalid.
EN - 10
1
2
6
5
4
3
Coolant return (red)
4
Coolant container
DANGER
WARNING
 3 Product description on page EN-5
TRBS 1203).
3
5
Motor with fan
6
Centrifugal pump
CR1000/CR1250

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cr1250

Tabla de contenido