Elevated Base Frame Installation (2 Speed Models Only) - Alliance Laundry Systems HC18MD2 Manual Del Instalacion

Lavadoras extractoras, gabinete de instalacion permanente
Ocultar thumbs Ver también para HC18MD2:
Tabla de contenido

Publicidad

Elevated Base Frame Installation
(2 Speed Models Only)
Factory-built elevated steel base frames are designed
to meet the specifications of the 2 speed model
washer-extractor only. Refer to Figure 12.
Figure 12
Installing with elevated base frame
1. Verify the floor meets the requirements given in
the Machine Foundation section.
2. Use the elevated base frame as a template by
positioning the frame in the desired location and
marking the pre-drilled mounting holes on the
floor.
F232135
H035I
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
3. Adjust the drill depth gauge to match the length
of the J-bolt, minus 1-1/2 inches (38 mm).
4. Drill and chisel out a conical hole large enough to
accept the J-bolt. Refer to Figure 13.
Figure 13
5. Use compressed air or a squeeze bulb to remove
debris from each hole. Anchor J-bolt in place,
using an industry-accepted anchoring compound.
Verify that the J-bolts are in the correct locations
and that 1-1/2 inches (38 mm) of each J-bolt
protrude from the floor. Refer to Figure 14.
1-1/2 in.
(38 mm)
Figure 14
Installation
H031I
H031I
H032I
H032I
23

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido