Connecting The Air Hoses; Mounting The Graf Empty Pipe Seal Made From Pe - Graf Klaro E Professional Instrucciones Para El Montaje

De una depuradora doméstica
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.6

Connecting the air hoses

The aeration system and the three air lift pumps must be connected to the valve strip in the switch
cabinet.
For the lifters, hoses with 13 mm inner diameter are required, while a hose with 19 mm inner diameter is
needed for the aeration hose. When connecting, make sure that the hoses are attached to the correct
connectors.
In order to avoid confusion, the lifters, the ventilation downpipe and the four connectors on the switch
cabinet have all been colour coded:
Red feed lifter
Stainless steel aeration
Black discharge lifter
Grey excess sludge lifter
As a general rule, the connections with the same colours must be attached to one another and fixed with
hose clamps. Hoses can be supplied in the relevant colours.
Recommended here is the GRAF empty pipe seal made from PE foam (art. no. 107887). Alternatively,
PU foam can be used.
4.7
Mounting the GRAF empty pipe seal made from PE foam
.
Insert the hoses from the empty pipe into the holes
in the empty pipe seal.
info@graf.info
www.graf.info
4. Assembly of the switch cabinet
Once the hoses have been laid and attached, the empty pipe must be
sealed in order to avoid gas exchange between the wastewater
treatment system and the surroundings of the cabinet (moisture,
odours).
Red hose , 13mm
Blue hose , 19mm
Black hose , 13mm
Clear hose , 13mm
Push the hose through the thin top layer. A plug of
material remains stuck in the end of the hose.
22 / 45

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

107437107438107439107440

Tabla de contenido