Bauer GLOBE Serie Manual De Instalación Y Mantenimiento página 20

Para portas basculantes a molas e seccionadas
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 45
3.4 GLOBE installation
GB
-
Establish and outline the fixing points of the guide on the
walls and ceiling.
Attention: use GLOBEC (fig. 7) for counterweight overhead
doors.
-
With the control unit on the ground, mount the guides on
the wall using the pulley support bracket.
-
Insert the mounting bracket [3] and secure using the
screws provided. Lift the unit and bend the brackets to
size (remove the excess parts if required), then mount to
the ceiling.
3
-
(Fig. 9) an intermediate GLOBESI support can be installed
to increase the holding strength of GLOBE.
3.5 Mounting arm to sectional doors
Mount the hook bracket [G] on the top side, interposing the
reinforcement angle [P] supplied, if required.
P
P
GLOBE - IP1839
H
E
1÷2
G
M
M
G
-
Manually release (see OPERATING INSTRUCTIONS) and
move the slide [4] to the closed door, fasten the arm [M] to
the slide [4] forming about a 45° angle with the upright of
the sectional door, if necessary, adjust the length of arm
[M] with arm [N].
L
4
45°
M
G
Attention: to fully open sectional doors that are especially high
the attachment point [L] can be moved from 20 to 100 mm further
in than [G]. If required insert a shim [J] (not supplied, max 200
mm), to increase the travel of the slide using the entire guide
available.
However, make sure that about a 45° angle remains between
the arm and the upright of the sectional door.
max
200
20÷100
J
L
45°
G
20
4
N
M

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Globe7Globe7jGlobe10Globe10j

Tabla de contenido