IN S TA L L AT I O N
Custom Panel
O VER L AY PA NE L
For overlay applications, a custom door panel must be
installed. The panel size is critical for a proper fit. To verify
panel requirements and dimensions, refer to the Sub-Zero
Design Guide at subzero.com/specs.
Finish all sides of the custom panel. They will be visible
when the door is open.
A D-style handle is recommended. The door handle must be
located near the edge of the panel opposite the hinge, cen-
tered top to bottom. Stainless steel tubular and pro handles
are avail able through an authorized Sub-Zero dealer. For
local dealer information, visit the find a showroom section
of our website, subzero.com.
10 | Sub-Zero Customer Care 800.222.7820
PAN EL IN STAL LATIO N
Remove the handle side bracket attached to the front of
the door. Place the custom door panel face down on a
protected work surface. Place the template on the back of
the door panel, then mark and drill the holes. Secure the
mounting bracket to the panel with the #8 x
provided. Refer to the illustration below.
Install the door panel by engaging the tabbed bracket to
the door. Once the door panel is in place, use the remaining
#8 x
1
/
" screws to secure the panel to the upper and lower
2
mounting brackets. Once secure, install the hinge covers.
Refer to page 11.
Template position
1
/
" screws
2
UPPER
BRACKET
LOWER
BRACKET
Mounting brackets