30
UK
FINAL CHECKS AND TESTING
Before powering the control unit, run the following tests:
1 - Check the electrical connections: improper connection may be harmful to both the control unit and the
operator.
2 - Check proper positioning of the limit switches.
3 - Check that the red LEDs of the normally closed contacts are on and that the green LEDs of the normally open
contacts are off.
4 - Check by tripping the limit switches that the corresponding LEDs go off.
5 - Check by passing across the range of the photocells that the corresponding LED goes off.
6 - Check by tripping the safety devices that the corresponding LED goes off.
7 - Check that the motors are locked and ready for operation with the GATE AT HALFWAY TRAVEL.
8 - Remove any obstacles in the range of action of the gate and then give a START command.
Upon the first command, the control unit starts an opening phase; check that the gate moves in the correct
direction. If not, invert the wires in the OPEN - CLOSE terminals.
9 - The LEDs indicate the status of the corresponding input
DISPOSAL BA230
Gi.Bi.Di. advises recycling the plastic components and to dispose of them at special
authorised centres for electronic components thus protecting the environment from
polluting substances.
JP4
START
PED
STOP
FCA M1
FCC M1
FCA M2
FCC M2
PHOTO 2
CONTR. PH1
COSTA
CCOSTA
PHOTO 1
COM
DL1
LED STATUS
DL2
ON
OFF
DL3
DL4
DL5
DL6
DL7
DL8
DL9
DL10
DL11
DL12
BA230