2.5 Electrical connections
Fitting the control panel
Open the upper cover of the boiler.
The control panel is inserted inside the boiler
Remove the instrument panel and place it on the front of the cover.
Make sure to run the cables in the appropriate outlets.
24
fig. 3 -
fig. 4 -
cod. 3541F442 - Rev. 00 - 06/2018
Open the instrument panel. Inside there are the screws (C) for
assembly. Secure the instrument panel to the upper cover with the
4 screws (C) supplied.
C
Close the cover
Gaster N 67 -- 107 AW
fig. 5 -
fig. 6 -
EN