2.5 Electrical connections
Fitting the control panel
Open the upper cover of the boiler.
The control panel is inserted inside the boiler
Remove the instrument panel and place it on the front of the cover.
Make sure to run the cables in the appropriate outlets.
Open the instrument panel. Inside there are the screws (C) for
assembly, the cable glands (B) and cable clamps (A). Secure the
instrument panel to the upper cover with the 4 screws (C) supplied.
C
24
fig. 3 -
C
x4
C
fig. 4 -
cod. 3541F272 - Rev. 00 - 06/2018
Use the clamps (A) to hold the cables, making sure they
cannot come into contact with the hot parts of the boiler
shell.
Close the cover
A
GASTER N 119 ÷ 289 AW
A
D
A
fig. 5 -
fig. 6 -
EN