Assembling the other
shelves
Levelling the Millrack
Turn the Millrack in vertical position and fix the top shelf and the two intermediate
shelves, each with 6 screws of the supplied kit (Ref. 9 – page 4).
Use a level to check the leveling of the Millrack.
To access and adjust the feet, remove the masking plastic plugs , remove the screws
and the support "A" from the bottom shelf.
A
6x
6x
6x
11