Maintenance Kit; Assembly - Weston PRO-2500 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MAINTENANCE KIT

The Maintenance Kit includes a Vacuum
Chamber Seal and an Aluminum Alloy Seal Bar
(FIGURE 2). These parts may wear over time
and require replacement, depending on usage.
There is one factory-installed Vacuum Chamber
Seal on the Chamber Vacuum Sealer. When
the Vacuum Lid is closed and the pump
engages, it forms an airtight seal. To replace,
simply remove it from the groove in the lid and
slide the replacement into the groove.
The fully assembled Aluminum Alloy Seal Bar
is also available as a replacement part in the
maintenance kit.
It can be difficult to replace the seal wire and
seal bar tape on the Aluminum Alloy Seal Bar.
If it is not installed correctly, you may risk short
circuiting the seal bar. For this reason we only
supply the fully assembled Seal Bar. We advise
that you contact Customer Support for technical
assistance.

ASSEMBLY

Place the Chamber Vacuum Sealer
on a flat, dry surface.
Plug the female end of the Power
Cord into the Power Supply Port on the
right side of the appliance (FIGURE 3).
Plug the male end of the Power
Cord into a standard, grounded 120-volt
household electrical outlet. DO NOT
attempt to modify the plug to fit into an
unsuitable outlet.
NOTE: The Chamber Vacuum Sealer is ONLY intended to be used with CHAMBER
VACUUM BAGS. DO NOT USE HOUSEHOLD BAGS OR EMBOSSED BAGS
INTENDED FOR USE WITH OUT OF CHAMBER SEALERS! Any other uses of
the Vacuum Sealer, other than the uses described in this booklet, could potentially
damage the appliance and void the warranty!
FIGURE 2
FIGURE 3
7

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

65-1201-w

Tabla de contenido