ENGLISH
4. Installation
ATTENTION
If the system is installed indoors, it is indispensable for the premises to be equipped with a drainage pit
of suitable dimensions to drain any breaks in the system. The dimensions of the drain must be suited
to the quantity of water supplied by the mains.
4.1 Wall assembly
Before installation, make sure that the sewerage system is at least 1-2 meters below the point in
which the ACTIVE SWITCH is to be installed (the road level is normally taken as the sewerage
level).
The location must have a discharge connected to the sewerage system.
The location must be dry and protected from the rain.
Flat wall, in a horizontal position.
Minimum distance from the ceiling 50 cm.
Proceed as follows:
1.
Position the fixing bracket on the wall and, making sure that it is perfectly horizontal with a level,
mark the position of the holes.
2.
Drill the fixing holes with a D.10 drill.
3.
Fix the bracket to the wall and check that it is level.
4.
Make sure that the bracket is securely fixed to the wall.
5.
Position the ACTIVE SWITCH unit as indicated in the diagram.
6.
Fix the safety screws, see fig. 02 and fig. 02A.
7.
Use the 4 vibration dampers provided between the bracket and the wall (2 vibration dampers)
and between the tank and the wall (2 vibration dampers) to reduce the transmission of vibrations
to the wall.
WARNING
The safety screws are essential in order to guarantee the stability of the system and personal
safety.
4.2 Overflow connection
Proceed as follows:
1.
Connect the DN50 discharge pipe to the overflow pipe of the system (see fig. 01 point 06.)
2.
Make sure that the discharge pipe has an incline that will guarantee the normal flow of possible
discharges.
Figure 2A
26