Installation
1
Frame Mounting
Typical installation is shown. It may be necessary to repair the wall
after mounting. The fixture may not cover all of the wall modifications.
A
Fasten plywood securely
to at least (4) studs.
16"
(406mm)
centers
14"
(356mm)
A
Floor
Fasteners (supplied by installer)
to secure backing to studs
Bradley • 215-1779 Rev. G: ECN 19-08-037A
Minimum required to
pick up four studs and
vertical frame members
– 56" (1422mm) min.
Drywall
D
Use
3
frame to plywood (9) places. Shim frame as necessary.
Support Backing Mounting
Height
Standard Height, ADA, and TAS
ADA, Juvenile and TAS, Grades
6 thru 12
B
C
Shim the frame at anchor points to
ensure the offset bracket is straight.
Leave the top three screws loose
for bowl installation.
56"
(1422mm)
⁄
" fasteners and square washers provided to secure the
8
2/27/2020
"A" Dimension
20" (508mm)
17" (432mm)
Drain, supplies and electrical box are
shown in their approximate locations.
Cut clearance holes in the plywood as
required.
NOTE: Plywood should equal the
thickness of the drywall (½" minimum).
LVLD3
7