Turn OFF electrical power to the electrical outlets, then unplug all electrical units prior to installation.
Electrical power MUST remain off until installation is complete.
Installer's hardware must be appropriate for wall construction. Wall anchors must have a minimum pull-out
rating of 1,000 lbs.
Make sure that all water supply lines have been flushed and then completely turned off before beginning
installation. Debris in supply lines can cause valves to malfunction.
Read this entire installation manual to ensure proper installation. When finished with the installation, file
this manual with the owner or maintenance department. Compliance and conformity to local codes and
ordinances is the responsibility of the installer. Product warranties may be found under "Products" on our
Web site at bradleycorp.com.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging
material. If any parts are missing, do not begin installation until you obtain the missing parts.
For standard height mounting, do not exceed the recommended 34" distance from the top of the lav deck
to the finished floor. To meet ADA requirements, the lav deck cannot exceed the 34" maximum height
dimension.
215-1777 Rev. F; ECN 16-08-008
© 2016 Bradley
Page 1 of 37
6/2/2016
Installation
LVLD1
Verge
®
with Evero
Patent Pending
Système lave-mains Verge
avec matériau au quartz naturel Evero
Brevet en instance
Sistema de lavabo Verge
con material de cuarzo natural Evero
Patente pendiente
WARNING
NOTICE
IMPORTANT
Lavatory System – LVLD-Series
Natural Quartz Material
®
®
P.O. Box 309
Menomonee Falls, WI 53052 USA
800 BRADLEY (800 272 3539)
+1 262 251 6000
bradleycorp.com
– Série LVLD
®
®
– Serie LVLD
®