Installation
2
Mounting Faucet Box and Valve to Frame
Mount the faucet box onto
A
the bracket with valve
positioned toward the wall
(if applicable).
Hang the faucet box bracket onto the
frame in the orientation shown. Piping
B
connection of box should point toward
the back of the unit (see faucet
installation instructions for assembly)
WARNING! Water supply to Battery Box
Solenoid MUST be supplied
using a plastic hose (provided
by Bradley).
Secure the TMA valve to the wall
C
at the location shown using (2) #10
fasteners. See rough-in section for
valve rough-in location.
Assemble the shutoff valves to
the hot and cold supplies. Attach
D
stainless steel 1/2" supply hoses
from the hot and cold shutoff valves
to the TMA valve.
3
Overflow Plug Assembly
#10-24 Screw
Packing Washer
A
Assemble overflow drain
cap to basin as shown.
Bradley • 215-1777 Rev. F; ECN 16-08-008
O-Ring (125-111)
Overflow plug
Overflow Plug Prepack
(S45-2812)
6/2/2016
Outlet to battery box.
Use 1/2" plastic supply
hose.
NONE Option
Plastic
Hose
LVLD1
9