4.3 Description of parts
A1824
1) Operator
2) Pilaster bracket
3) Gate bracket
4) Screw, bushing and nut for the pilaster
bracket
5) Bolt and nut for the gate bracket
6) Distanziale per perno attacco
4.4 Dimensions
5 Installation
Installation must be carried out by expert qualified personnel and in full compliance with current regulations.
5.1 Preliminary checks
Before installing, do the following:
•
Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage;
•
Fit tubing to drain away any water leaks which may cause oxidation;
•
Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra
insulation as compared to the other conductive parts inside;
•
Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving
parts;
•
Make sure there is a mechanical stop for opening and closing.
4
2
1
3
(mm)
6
5
3