Pump Head Variants - Ecolab EcoPro Serie Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 368
Description of the pump
5.4

Pump head variants

The litre capacity of the pump is defined depending on the design of the pump
head and of the metering valves.
NOTICE!
Tightening torques of the metering head screws are given on an adhesive label
on the corresponding metering head and must always be observed.
Following initial commissioning and all maintenance work on the metering
head, the screws should be tightened diagonally after 24 hours according to
the specifications to ensure the leak-tightness of the system.
The maintenance intervals must also be observed.
Fig. 6: Pump head variants
417102264 Rev. 5-01.2019
28

Publicidad

Tabla de contenido
loading

Tabla de contenido