Tubing Connections and Soap Pump Installation
8. Connect a length of 830-72 Intermediate Tubing from the first Tee to the next
Tee locations. Cut Tubing to desired length between soap pumps and connect
to successive locations except the last soap pump in the line. Make sure tube is
completely engaged on the Tee fittings.
9. Connect intermediate tube to last horizontal arm of Tee at next to last soap pump in
the line. Connect 830-312 3-barb reducing connector to other end of last intermediate
tube under last soap pump in the line. Connect bottom end of vertical tube of the last
soap pump in the line to small end of 830-312 3-Barb reducing connector. Make sure
tube is completely engaged on the fittings.
10. Screw Cable Supports into wall between each Soap Pump to support along wall.
11. Attach intermediate tubing to cable supports with the cable ties between soap pumps
Form No. 830-569 r11/13/12
S/F
© 2018 Bobrick Washroom Equipment, Inc.
(Existing and New Soap Dispensers)
Printed in U.S.A.
Page 7