Telescopic Stack Installation
6. Align the telescopic stack to the pre-drill
holes on the ceiling and fasten to the ceiling
with four mounting screws (not provided).
Make sure screws are driven into the ceiling
at the middle of joists and cross framing
lumber for maximum support and stability.
7. Adjust the telescopic stack using reference
F in Table 1 and measurement on Page 15.
Tighten from the side with 8 screws
(provided) as shown in Figure 4.
8. Slide the duct covers up the telescopic
stack, and temporary hold the duct covers
up.
Hood Installation
9. Install the exhaust plate using 4 screws.
10. Align the hood with the telescopic stack and
lock the unit in place. Refer to Figure 5.
Wiring to Power Supply
SAFETY WARNING
RISK OF ELECTRICAL SHOCK.
RANGE
HOOD
GROUNDED.
MAKE SURE THIS IS DONE
BY
A
QUALIFIED
ACCORDANCE WITH
NATIONAL
AND
CODES.
BEFORE CONNECTING WIRES,
SWITCH POWER OFF AT SERVICE PANEL
AND LOCK SERVICE PANEL TO PREVENT
POWER
FROM
BEING
ACCIDENTALLY.
11. Route house wiring into the ceiling as close
to the installation location as possible.
Allow additional length of wiring to drop
down from the ceiling to the electric box.
12. Connect the electrical wires according to
color (green to green, white to white, and
black
to
black)
connectors. Green wire must be grounded
to reduce risk of electric shock.
MUST
BE
PROPERLY
ELECTRICIAN
ALL
APPLICABLE
LOCAL
ELECTRICAL
SWITCHED
and
cap
with
Figure 4
Figure 5
THIS
IN
ON
wire
8