Installation; Unpacking; Input Power Connections - GALAGAR SMART CUT 1000 Manual Técnico De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. 3. 3. 3. Installation

Installation
Installation
Installation

3.1. Unpacking

3.1.
3.1.
3.1.
Unpacking
Unpacking
Unpacking
Use the packing lists to identify and account for each item.
1. Inspect each item for possible shipping damage. If damage is evident, contact your distributor and / or
shipping company before proceeding with the installation.
2. When using forklift, its arm length must be long enough to reach the outside so as to ensure lifting safely.
3. The movement may bring the potential danger or substantive hazard, so please make sure that the machine
is on the safe position before using.

3. 3. 3. 3.2 2 2 2 . . . . Input Power Connections

Input Power Connections
Input Power Connections
Input Power Connections
Supply input connection of CUT100 power is shown as the Fig3.1.
1. Check your power source for correct voltage before plugging in or connecting the
unit
2. Power Cord and Plug This power supply includes an input power cord and plug
suitable for 380V AC 3 - Phase input power.
3. If the power supply voltage continually goes beyond the range of safe work
voltage range, it will shorten the welder life-span. The following measures can be
used:
Change the power supply input. Such as, connect the welder with the stable
power supply voltage of distributor;
Reduce the machines using power supply in the same time;
Set the voltage stabilization device in the front of power cable input.
SMART CUT 1000
Fig 3.1 the connect method of the main
Fig 3.1 the connect method of the main
Fig 3.1 the connect method of the main
Fig 3.1 the connect method of the main
supply
supply
supply
supply
17

Publicidad

Tabla de contenido
loading

Tabla de contenido