Installation PI485
Fixez le PI485 PCB comme indiqué sur les figures ci-dessous.
Pour plus d'informations sur l'installation du PI485, consultez le guide d'installation spécifique.
18 kBtu/h, 24 kBtu/h
30 kBtu/h, 36 kBtu/h
This label is should be applied in the location
This label is should be applied in the location
where
where
LGAP(Sub PCB for Central Controller is
LGAP(Sub PCB for Central Controller is
installed.
installed.
the LGAP.
the LGAP.
Please connect the wire after installing
Please connect the wire after installing
48 kBtu/h, 54 kBtu/h
ay.
ay.
PI485 Gatew
PI485 Gatew
lation of
lation of
for instal
for instal
the space
the space
This is
This is
ling PI485
ling PI485
(Acce ssory
(Acce ssory
)
)
after instal
after instal
the wire
the wire
conne ct
conne ct
Pleas e
Pleas e
Gatew ay.
Gatew ay.
MEZ3 01718
MEZ3 01718
02
02
Installation PI485
Manuel d'installation 45