100(S)-E400, 100(S)-E460
300(S)-GO
8 mm
M10
(0.31 in)
35 Nm - 310 lb-in
A1
A2
100(S)-E400, 100(S)-E460, 300(S)-GO
100-EC*
100-EA*
M8
(0.24 in)
contacts at the same time.
100(S)-E580, 100(S)-E750
100(S)-E400, 100(S)-E460, 300(S)-GO
100-E1260, 300(S)-HO
10 mm
M12
(0.39 in)
45 Nm - 400 lb-in
ø 5 mm (0.20in)
M3.5
1 Nm - 9 lb-in
1/4
x4
Torx T20
x6
6 mm
M8
THE90*, TJE90*
1/4
x4
Max 47 mm
Max 45 mm
(1.85 in)
(1.77 in)
Pozidriv N° 2
100(S)-E580, 100(S)-E750, 300(S)-HO
x6
100-EA400...1260
100(S)-E400...E750
300(S)-GO, 300(S)-HO
195 lb-in
22 Nm
100-E1260
310 lb-in
35 Nm
6 mm
(0.24 in)
100(S)-E580, 100(S)-E750, 100-E1260, 300(S)-HO
Max 50 mm
(1.97 in)
2
2 x 1...................2.5 mm
2x AWG 18...14
2
2 x 0.75.............2.5 mm
/ > 3.5 mm, L < 8 mm
2x AWG 18...14
100-E1260
100-EA400, 460, 580, 750, 1260
x3
contacts at the same time.
For 100(S)-E580...E750 and 300(S)-HO contact kits
and arc chutes need to be replaced after 700k
operations.
x6
100-EC460, 750
1/4
x4
2/5
Max 52 mm
(2.05 in)
(0.31 in)
(0.14 in)