Fastening materials:
• Dowel Ø 10/50 (15) and screw
ST6 x 50mm (16) for concrete
and load-bearing masonry.
• Screw ST6 x 50mm (16) for
load-bearing wooden beam struc-
tures.
Note: inquire at a specialist retailer
about suitable installation materials
for the floor and ceiling brackets.
Assembly
To assemble the product you will
need the following tools (not in-
cluded in the package contents):
a suitable drill, measuring tape, a
cross-head screwdriver, a spanner
and a hex key.
WARNING! Because of the risk
of falling, make sure that the person
installing the product is sufficiently
secured with a harness.
Note: to ensure optimal stability of
the product, we recommend fasten-
ing the floor and ceiling brackets.
Installing the ceiling
bracket
Important: both ceiling brackets
must be perfectly aligned and have
a distance of exactly 190cm from
each other (measured between
the inner drill holes of both ceiling
brackets) (Fig. E).
Place the ceiling bracket (12) in the
desired position and mark 2 holes
opposite each other with a pencil
(Fig. B).
1. Using the appropriate tool, drill
2 holes in the marked places.
Insert 1 dowel (15) into each hole
(Fig. C).
Note: use other dowels and screws
if required for the installation sur-
face.
2. Place a plastic cap (11) onto
each ceiling bracket (12) and
insert 2 screws (16) through each
washer (20) (Fig. D).
3. Mount the ceiling bracket onto
the ceiling.
4. Mount the second ceiling bracket
as described in steps 1–4.
Installing the floor bracket
1. Plumb the exact position of the
floor bracket (13) with a cord
(not included in the package
contents). Mark the correct places
and, using a pencil, mark 2 holes
opposite each other (Fig. F).
Note: the floor bracket (13) must
be positioned perpendicular to the
ceiling bracket (12).
2. Using the appropriate tool, drill
2 holes in the marked places.
Insert 1 dowel (15) into each hole
(Fig. G).
Note: if necessary, use other dow-
els and screws if required for the
mounting surface.
GB/IE
21