Installation Instructions - Cardin SL Serie Manual De Instrucciones

Ocultar thumbs Ver también para SL Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

PRELIMINARY CHECKS (fig. 1, pag. 2)
Before starting the installation make sure that the structure which is to be auto-
mated is in good working order and respects the local standards and regulations
in force. To this end ensure that:
- The surface of the sliding gate "A" is smooth and has no protrusions up to a
distance of 2.5 m from ground level. Protrusions on the gate surface which are
not greater than 3 mm and have rounded edges are acceptable. If the surface
of the gate is not smooth, the entire height up to 2.5 m from the ground must
be protected by two of the following devices:
a) photoelectric cells
b) contact safety buffer
- the distance "B" between the fixed parts and sliding parts of the installation
must not exceed 15 mm.
- the runner guide "C", preferably round, should be securely fixed to the ground,
completely exposed and free of any imperfections which could inhibit the
correct movement of the gate.
- when the gate is closed a space of 50 mm "D" must remain for the entire
height of the front part of the gate and a mechanical travel limit "E" must be
positioned on the upper part of the gate.
- The free space "D" can be covered with a rubber anti-crush buffer "F" or
better still a pneumatic or photoelectric contact safety buffer.
- if the gate slides past a fixed structure "G" which has railings or bars leaving
open spaces, it must be protected in one of the following ways:
1. distance "H" greater than 500 mm: no protection required;
2. distance "H" between 500 and 300 mm: wire mesh fencing "I" or punched
metal plating "L" with an opening which does not allow the passage of a 25
mm diameter sphere "M" must be fitted;
3. distance "H" smaller than 300 mm: wire mesh fencing "I" or punched metal
plating "L" with an opening which does not allow the passage of a 12 mm
diameter sphere "M" must be fitted.
The wires of the mesh "I" must not have a cross-section of less than 2,5 mm
the punched metal plating "L" must not have a thickness of less than 1,2 mm.
Protection is not necessary for the area "P" if the fixed structure with railings
or bars is over 2,5 m above the ground.
- check the gate components, replace any worn or damaged parts and then
lubricate them.
- using a spirit level "N" check that the castor guide is in square.
- the upper runner guide "O" must have the correct play for the gate and must
not inhibit the gate's sliding action.
- check that a mechanical travel limit "Q" (absolutely necessary) has been
fitted in the opening direction and that it corresponds to the maximum travel
distance "P" of the gate.
The travel limit must guarantee anti-derailment and gate stability.
Warning! It is the installer's responsibility to check all critical danger
points, to take action and to install any devices needed to guarantee
the safety of all people using the gate (risk analysis).
Before carrying out any cleaning or maintenance operations make sure the
power is disconnected at the mains, the motor power cables are disconnected
and the batteries have been disconnected.
USER INSTRUCTIONS
During the opening/closing manoeuvre check for correct operation and activate
the emergency stop button in case of danger. During normal use wait for the
gate to completely open before crossing it.
During blackouts with a flat battery the gate can be released and manually
manoeuvred (see manual release fig. 8).
Periodically check the moving parts for wear and tear and grease if required,
using lubricants which maintain their friction levels unaltered throughout time
and are suitable for temperatures of -20 to +55°C.
In case of failure or operational anomalies switch off the power at the mains,
disconnect the batteries and do not attempt to repair the appliance yourself.
Eventual repair work must be carried out by specialised personnel using original
spare parts.
The appliance is suitable for continuous operation.
Note: The newly installed system is guaranteed and respects the laws and
standards in force. It is however the user's responsibility to maintain the efficiency
of the installation.
You are advised to have the installation checked at least once a year by quali-
fied personnel.

INSTALLATION INSTRUCTIONS

All rights reserved. Unauthorised copying or use of the information contained in this document is punishable by law
• The minimum controls which may be installed are OPEN-STOP-CLOSE,
these controls must be installed in a location not accessible to chil-
dren.
• The geared motor can be positioned either to the left or to the right of
the passageway.
Important: read the paragraph "INSTRUCTIONS FOR POSITIONING
THE UNIT".
Once the correct position has been chosen proceed as follows:
Anchoring the unit (fig. 4, 5, 6)
• Prepare a cement base with the base plate "3", anchor plates and the
tube for the electrical cables "4" embedded, use the opening in the
base plate and the four threaded M 8 anchor
bolts which should protrude by 40 mm.
All rights reserved. Unauthorised copying or use of the information contained in this document is punishable by law
All rights reserved. Unauthorised copying or use of the information contained in this doc
and
2
5
SCALA: 1:2
Drawing number :
DI0065
• The base should be perfectly level, all surfaces should be free of dirt
Product Code :
SL4024
and the M8 thread of the anchor bolts should emerge perpendicularly.
Draft :
P.J.Heath
Date :
08-06-98
Note: If possible the cement base should protrude by about 50 mm. This
CARDIN ELETTRONICA S.p.A - 31020 San Vendemiano (TV) Italy - via Raffaello, 36 Tel: 0438/401818 Fax: 0438/401831
will avoid damage by pools of water building up under the appliance.
• To install the geared motor proceed as follows:
• Unscrew the four M8 nuts on the four threaded bolts (previously used
to block the anchor bolts) and leave a space of 15 mm between the
anchor plate and the base of the motor.
Then insert the four washers and
allow them to rest on the nuts.
SCALA: 1:2
• Position the geared motor over
Drawing number :
DI0344
the four threaded bolts and allow
Product Code :
SL424E
it to rest on the four washers.
Date :
Draft :
P.J.Heath
17-06-2004
CARDIN ELETTRONICA S.p.A - 31020 San Vendemiano (TV) Italy - via Raffaello, 36 Tel: 0438/401818 Fax: 0438/401831
• Fasten it to the base using the
other four washers and adjust-
ment nuts supplied with the kit,
making sure that the unit remains
perfectly level and stable. This
will allow you to adjust the height
and position of the motor later
on.
13
3
1
2
4
300
Description :
Prodotti Technocity
CONTROPIASTRA SL4024
5
Description :
Prodotti Technocity
VISTA CONTROPIASTRA SL4024
70
M 8
4
5
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

101/sl424ebss

Tabla de contenido