Please install it after installation of connection pipe and drainage pipe according to Fig.4.6
① Loosen the screws and adjust the baffle position up and down to clamp connection pipe/drainage pipe as
much as possible.
② Tighten the screws.
5 Wiring Work
Notes:
Units must be earthed securely, or it may cause electric shock.
①
Please carefully read the wiring diagram before carry out the wiring work, incorrect wiring could cause
②
malfunction or even damage the unit.
The unit should be powered by independent circuit and specific socket.
③
The wiring should be in accordance with related regulations in order to ensure the units reliable running.
④
Install circuit breaker for branch circuit according to related regulations and electrical standards.
⑤
Keep cable away from refrigerant pipings, compressor and fan motor.
⑥
The communication wires should be separated from power cord and connection wire between indoor
⑦
unit and outdoor unit.
Adjust the static pressure via wired controller according to site circumstance.
⑧
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.