Preparation
PREPARE THE OPENING (cont.)
Installation beside another GE/Monogram
Built-in Speedcook Oven:
GE/Monogram oven beside the other, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 4-1/2 minimum shown.
PREPARE THE OPENING (cont.)
Installation under a GE/Monogram 30 or 36 Cooktop or Countertop:
Gas or electric cooktops may be installed over this oven. See cooktop installation instructions for the cutout
size. See the label on top of the oven for approved cooktop models. This oven requires a separate, properly
grounded 15-Amp, 120-Volt, 60Hz power supply. The cooktop requires a separate power supply. Use a 36
or wider base cabinet.
4 High
Toekick
Installation Preparation
WITHOUT
Cooktop
23-1/2
an Accessory Storage Drawer
25-1/4
17-1/2
25
Cooktop
17-1/2
25-1/4
NOTE: The oven is only approved to be installed
under the specific models as labeled on the unit.
9
23-1/2
25-1/4
4-1/2 Min.
(5-1/2 Recommended)
1-1/2 Min.
36
Countertop
Height
Cooktop height including depth
of electrical box on some models.
Refer to cooktop installation
instructions.
No minimum clearance required
between cooktop and oven.
17-1/2